Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Cardin, M-A (2011) Quantitative performance-based evaluation of a procedure for flexible design concept generation, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Chiang, R (2002) Agency and incentive contract in private investment of transport project: An exploration of fundamental relationships, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Garvin, M J (2001) Strategic indicators for characterization of water system infrastructure and management, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Kristinsdottir, A (2012) Risks and decision making in development of new power plant projects, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Kua, H W (2006) The design of effective policies for the promotion of sustainable construction materials, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

  • Type: Thesis
  • Keywords: sustainability; vertical integration; employment; feedback; integration; manufacturing; policy; sustainable building; sustainable construction; stakeholder; Chile; Denmark; Sweden; United Kingdom; United States; case study; motivation; legislation
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/304949485
  • Abstract:
    This research explores the associated effects of policy tools employed to promote sustainable building materials. By comparing the original motivations and intended effects of these policies and their actual outcome, and subsequently understanding the reasons behind any disparities between them, we suggest ways by which future policy planning can be improved. This research is based on seven detailed case studies. They cover the applications of virgin material taxes in Denmark and Sweden, forest management and biodiversity legislations in United States' Northwest and its coupling economic adjustment initiative, legislations/public outreach/demonstration projects on the use of substitute fuels for cement manufacturing in United States and the United Kingdom, and economic incentives to promote afforestation/reforestation in Chile. Each of these cases is attended by negative, unanticipated outcomes. By analyzing these outcomes, we observe that a negative and unanticipated policy outcome occurs when a sustainability indicator/issue is either completely ignored by policymakers, or the policymakers fail to identify intrinsic but inconspicuous links between seemingly disparate indicators. These unexpected outcomes can be reduced, or avoided, if policymakers conceptualize policies more broadly, for which purpose we propose the concept of integrated policymaking. This concept promotes the idea of co-addressing, or even co-optimizing, a wide range of eleven to sixteen sustainability indicators covering all the three domains of sustainability---economy, environment and employment. Furthermore, in doing so, policymakers must promote interactions among the different levels of governmental agencies (i.e. horizontal and vertical integration) and between the governmental and non-governmental stakeholder groups (i.e. time horizon integration and integration across stakeholder groups). We emphasize the significance of five different but interrelated types of feedback loops in supporting these different types and goals of integration. Finally, we applied this concept to the seven cases and proposed a series of innovative integrated policy strategies to address the negative, unanticipated outcomes observed. (Copies available exclusively from MIT Libraries, Rm. 14-0551, Cambridge, MA 02139-4307. Ph. 617-253-5668; Fax 617-253-1690.)

Lee, S (2006) Dynamic planning and control methodology: Understanding and managing iterative error and change cycles in large-scale concurrent design and construction projects, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Miller, J B (1995) Aligning infrastructure development strategy to meet current public needs, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Minelli, P (2020) Improved methods for managing megaprojects, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Moret, Y (2011) Modeling cost and time uncertainty in rail line construction, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Park, M (2001) Dynamic planning and control methodology for large-scale concurrent construction projects, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Slaughter, E S (1991) Rapid innovation and integration of components: Comparison of user and manufacturer innovations through a study of residential construction, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Sousa, R L (2010) Risk analysis for tunneling projects, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Taylor, D D J (2018) Tools for managing intermittent water supplies, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Tsai, I T (2007) Default and renegotiation: Financial structure and incentive in public-private partnership contracts, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Viteri, V R (2003) Experiential learning environments for structural behavior, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Wang, M-T (1989) Knowledge processing for a construction management database, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Wooldridge, S C (2002) Balancing capital and condition: An emerging approach to facility investment strategy, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Yan, S (1992) Intermodal pricing and operations using network flow techniques, Unpublished PhD Thesis, , Massachusetts Institute of Technology.